NEWS OF JUNE 2015
Manufacturing of the flue gas-/air heat exchanger is almost finished. The manufacturing of the storage modules has commenced, the isolation material is ordered, the high temperature valves are already available. First tests of the measurement equipment will take place end of June 2015.
Temperature record: The TESS 2 C- storage test facility has shown excellent results for charging and discharging during the operation tests at temperatures of more than 600 °C!