News of June 2015

Manufacturing of the flue gas-/air heat exchanger is almost finished. The manufacturing of the storage modules has commenced, the isolation material is ordered, the high temperature valves are already available. First tests of the measurement equipment will take place end of June 2015.

Best Business Idea

Best Business Idea

STORASOL GmbH wins the award in the category 'Advanced Stage' as 'Best Business Idea'.

ORCTES Bayreuth

Engineering works for the ORCTES-plant are full steam ahead ongoing. The heat exchanger for transfering the heat to air as heat carrier medium has been ordered at company GEA Ecoflex.

Contract with University of Bayreuth

STORASOL, enolcon and the Steinbeis-company ATEV located at University of Bayreuth are signing the contract about the realization of the large scale high temperature thermal energy storage HTTES (Project name ORCTES).

News of December 2014

Hochtemperatur-Wärmespeicher

Measurements with the isothermal fluid model plant succesfully finished
Verfication of a CFD-planning tool successfully finished
Operation of TESS 2 B with different material (e.g. Sand) ongoing